TOLL

What software pays for, recorded every six hours.

Snapshot
2026-10-13 14:08 UTC
Sweep
daily-2026-10-21 · finished 2026-10-21 22:33 UTC
Listed
32,435

micro assembly critical path derived

www.mahastrategies.comIdentityderived

POST https://www.mahastrategies.com/api/v1/micro/assembly-critical-path

passlisted in Coinbase#48 by calls of 156 on this host

0.057 USDC

per call, as the listing declares it on eip155:8453

Compare with anotherEvery figure as JSONCite this page

the price, as of 2026-10-13 14:08 UTC · method · pinnable

Validation state
pass
as of 2026-10-21 19:56 UTC · method · pinnable · sweep daily-2026-10-21
Uptime, 7 / 30 / 90 days
100% / 100% / 100%
as of 2026-10-21 19:56 UTC · method · pinnable · 6 of 6 in 7d, 10 of 10 in 30d, 10 of 10 in 90d
Calls, trailing 30 days
1
as of 2026-10-13 14:08 UTC · method · pinnable
Unique payers, trailing 30 days
1
as of 2026-10-13 14:08 UTC · method · pinnable
Last called
2026-10-11 09:02 UTC
as of 2026-10-13 14:08 UTC · method · pinnable
First observed by TOLLderived
2026-10-11
as of 2026-10-11 12:46 UTC · method · pinnable · observation began 10 September 2026; listings that predate it show that date
Pricederived
0.057 USDC
as of 2026-10-13 14:08 UTC · method · pinnable · on eip155:8453
Networks
1
as of 2026-10-13 14:08 UTC · method · pinnable

Counters

6 observations, 1 of them a change, fewer than the 3 a trace needs

How big is this endpoint among the ones like it?

1 call100,000this endpoint
Calls counted in the trailing thirty days across the 2,150 endpoints in Identity that carry counters, binned on a logarithmic scale because the range runs over five orders of magnitude. The marked bin is this endpoint, at 1: 1,412 in the category are counted higher and 737 lower.

No trace is drawn of this endpoint’s own volume. Its counters have changed 1 time across 6 observations, and 3 changes are the fewest this site will draw a trace through, because two points and a guess are not a series. Every observation is in the JSON.

In words

TOLL's first observation of micro assembly critical path was 2026-10-11.

micro assembly critical path, a POST endpoint on www.mahastrategies.com, appears in the Coinbase registry; TOLL's taxonomy puts it in identity.

On Base, micro assembly critical path asks 0.057 USDC per call.

Callers of micro assembly critical path supply a json body with the fields tasks, dataClass and resources.

micro assembly critical path answered the sweep of 2026-10-21 with a valid 402, as at every sweep since 2026-10-11.

A response from micro assembly critical path, as declared, includes result, offerId, version, boundaries, inputDigest, receiptDigest and 1 other.

Of www.mahastrategies.com's 156 listings, micro assembly critical path ranks tied 48th by calls with 108 others.

micro assembly critical path drew a single call from a single payer in the trailing 30 days.

The last call to micro assembly critical path came 2 days before the snapshot, 2026-10-11.

Closest in price to micro assembly critical path within identity: grounded at council.cyberwarex.com and verdict attest claim at rubric-protocol.com.

micro assembly critical path is priced above 88% of comparable listings in identity.

Its payee wallet receives for 156 listed endpoints on one host.

The seller's tags on micro assembly critical path are bounded-computation, evidence, deterministic and microproduct.

Payment options as declared

the payment options, as of 2026-10-13 14:08 UTC · method · pinnable

Every payment option declared on this listing
registrynetworkassetamountschemepay to
Coinbaseeip155:8453USDC0.057 USDCexact0xec84c1…62de28

Preflight checks at the last sweep

the checks, as of 2026-10-21 19:56 UTC · method · pinnableendpoint answered HTTP 402

No named check failed.

Validation history, 90 days

Every sweep that observed this endpoint, newest first.

Validation observations over the last 90 days
observed, UTCstatefailed checkssweep
2026-10-21 19:56 UTCpass0daily-2026-10-21
2026-10-20 20:50 UTCpass0daily-2026-10-20
2026-10-19 10:24 UTCpass0daily-2026-10-19
2026-10-18 17:23 UTCpass0daily-2026-10-18
2026-10-16 08:17 UTCpass0daily-2026-10-16
2026-10-15 10:11 UTCpass0daily-2026-10-15
2026-10-14 08:04 UTCpass0daily-2026-10-14
2026-10-13 12:55 UTCpass0daily-2026-10-13
2026-10-12 10:18 UTCpass0daily-2026-10-12
2026-10-11 12:50 UTCpass0new-after-daily-2026-10-11

Registry presence

Presence in a registry, not liveness of the service (method). Newest first.

  1. listed in Coinbase

Declared input and output, as listed

From the registry record, not validated by TOLL.the declared schema, as of 2026-10-11 09:02 UTC · method · live

The input and output block
{
  "input": {
    "body": {
      "tasks": [
        {
          "key": "prep",
          "dependsOn": [],
          "resources": [
            "bench"
          ],
          "durationTicks": 2
        },
        {
          "key": "assemble",
          "dependsOn": [
            "prep"
          ],
          "resources": [
            "bench"
          ],
          "durationTicks": 3
        }
      ],
      "dataClass": "synthetic",
      "resources": [
        {
          "key": "bench",
          "capacity": 1
        }
      ]
    },
    "type": "http",
    "method": "POST",
    "bodyType": "json"
  },
  "output": {
    "type": "json",
    "example": {
      "result": {
        "tasks": [
          {
            "key": "assemble",
            "slack": 0,
            "critical": true,
            "latestStart": 2,
            "latestFinish": 5,
            "earliestStart": 2,
            "earliestFinish": 5
          }
        ],
        "dataClass": "synthetic",
        "projectTicks": 5,
        "resourceClaims": [
          {
            "capacity": 1,
            "resource": "bench",
            "exceedsCapacity": false,
            "peakDeclaredUse": 1
          }
        ],
        "topologicalOrder": [
          "prep",
          "assemble"
        ],
        "declaredResourcesOnly": true,
        "resourceConstrainedSchedule": false
      },
      "offerId": "assembly-critical-path",
      "version": "maha-microproducts/0.1",
      "boundaries": [
        "Public or synthetic inputs only. Caller labels are declarations,…"
      ],
      "inputDigest": "sha256:97371574d6f54652b65974f1630d067115687a685b17fa62ab4212886…",
      "receiptDigest": "sha256:f2119526395fd3f4d0a787676f43745e2f5b158ad171dd074849a6a6d…",
      "amountBaseUnits": "57000"
    }
  }
}
Cite this page

The pinned URL below renders this page from the snapshot of 2026-10-13 14:08 UTC and does not change; the live page does, every six hours. Data reuse is under CC BY 4.0 (terms).

Plain text

TOLL, "micro assembly critical path on www.mahastrategies.com", snapshot of 2026-10-13 14:08 UTC. https://tollindex.com/e/www-mahastrategies-com-api-v1-micro-assembly-critical-path-a846ae/at/2026-10-13T14-08Z. Accessed [access date].

BibTeX

@misc{toll-e-www-mahastrategies-com-api-v1-micro-assembly-critical-path-a846ae-2026-10-13T14-08Z,
  author = {TOLL},
  title = {micro assembly critical path on www.mahastrategies.com},
  howpublished = {\url{https://tollindex.com/e/www-mahastrategies-com-api-v1-micro-assembly-critical-path-a846ae/at/2026-10-13T14-08Z}},
  year = {2026},
  month = {10},
  note = {Pinned view of the snapshot of 2026-10-13 14:08 UTC. Accessed [access date].}
}

Reports and replies about this endpoint

None yet. Anything submitted through the form below is published here with its outcome.

Report an error about micro assembly critical path, or reply as the named seller

No account, no token. Published unedited with its outcome, upheld or not. Do not include personal data.

Kind

Published as typed. Optional.

10 to 4,000 characters.

Verify with the payee wallet (optional, EVM)

Sign this message with the wallet named on the page and paste the signature; it is checked, stored, never published. TOLL reply about endpoint a846ae17af5d79f6882ba15bf346998823296b24e9eb694de3caf5f2c3832492 from wallet 0xec84c1cd6602bbe387bc8e6f0d3c062f2762de28

The 0x address named as payee on this page, 42 characters.

The hex signature of the message above, starting 0x.